The project scope included the following deliverables:
Headway Clearance Optimisation: Designing MEP systems to maximise headway clearance by carefully integrating them with the Shopping Mall's architectural and structural elements.
Compliance Documentation: Conducting a thorough study and documentation of fire compliance, building codes, and MEP norms to ensure that all systems meet the required regulatory standards.
Prefab and Modular Components: Incorporating prefabricated and modular components into the MEP system design to enhance space utilisation and streamline installation processes.